Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Dec 02, 2023     More wire routing to ACM aircraft fwd connector - (6 hours)       Category: Engine
Installed ElectroAir MAP sensor and attached the ground wire from the B&C voltage regulator to grounded corner of the MAP. Installed Alt field 2 wire from voltage regulator to the ACM A/C front connector. Drilled, deburred and dimpled the subpanel for AN3 nutplates after I incorrectly installed AN4 nutplates earlier. Installed the ACM. Cut to length Alt 1 & 2 wires and boost pump wire. Installed D sub pins on to each wire. Added a pigtail to the electric boost pump AWG 14 wire. Ran snake skin shielding over said wires and added edge trim to a subpanel lightening hole. Also added some fuel tubing to connect the manifold pressure to the Advanced Avionics MAP sensor.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.